<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v2.3 20070202//EN" "journalpublishing.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="research-article">
  <front>
    <journal-meta>
      <journal-id journal-id-type="nlm-ta">REA Press</journal-id>
      <journal-id journal-id-type="publisher-id">20</journal-id>
      <journal-title>REA Press</journal-title><issn pub-type="ppub"> 3042-1365</issn><issn pub-type="epub"> 3042-1365</issn><publisher>
      	<publisher-name>REA Press</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">https://doi.org/10.48314/jcase.vi.60</article-id>
      <article-categories>
        <subj-group subj-group-type="heading">
          <subject>Research Article</subject>
        </subj-group>
        <subj-group><subject>Project quality, Multi-criteria decision making, Construction</subject></subj-group>
      </article-categories>
      <title-group>
        <article-title>Identifying and Ranking Factors Affecting the Quality of Construction Projects Using the Fuzzy Delphi and Fuzzy ANP Approaches</article-title><subtitle>Identifying and Ranking Factors Affecting the Quality of Construction Projects Using the Fuzzy Delphi and Fuzzy ANP Approaches</subtitle></title-group>
      <contrib-group><contrib contrib-type="author">
	<name name-style="western">
	<surname>Zare</surname>
		<given-names>Hamed </given-names>
	</name>
	<aff>Department of Building Technology Engineering, Faculty of Civil Engineering, Imam Mohammad Baqer University, Sari, Iran.</aff>
	</contrib></contrib-group>		
      <pub-date pub-type="ppub">
        <month>08</month>
        <year>2025</year>
      </pub-date>
      <pub-date pub-type="epub">
        <day>06</day>
        <month>08</month>
        <year>2025</year>
      </pub-date>
      <volume>2</volume>
      <issue>3</issue>
      <permissions>
        <copyright-statement>© 2025 REA Press</copyright-statement>
        <copyright-year>2025</copyright-year>
        <license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by/2.5/"><p>This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.</p></license>
      </permissions>
      <related-article related-article-type="companion" vol="2" page="e235" id="RA1" ext-link-type="pmc">
			<article-title>Identifying and Ranking Factors Affecting the Quality of Construction Projects Using the Fuzzy Delphi and Fuzzy ANP Approaches</article-title>
      </related-article>
	  <abstract abstract-type="toc">
		<p>
			This research aims to identify and rank the factors influencing the quality of construction projects .The present study is based on a mixed research method, in which a combination of qualitative and quantitative methods was used. From the perspective of the purpose, it is an applied research because the results of the present study are used to increase the quality of construction projects. In terms of data collection method, the present study is a descriptive survey research and in terms of data analysis method, it was classified as quantitative research. The statistical population of the present study was all experts and activists in the field of construction in Tonekabon city, from which 10 people were selected using the convenience sampling method. Data analysis was performed using the Fuzzy Delphi Method and Fuzzy AHP. The results of the Fuzzy Delphi analysis showed that 10 criteria including the employer's justification in terms of project quality, the employer's justification in terms of project time, the project manager's activity, the quality of project planning, the constructability of the designs, Monitoring project workshop activities, selecting and monitoring contractors, communication and cooperation between implementation agents, proper financial management, and selecting the best contractor are the most influential factors in improving the quality of construction projects in Tonekabon County. The ranking and importance of each criterion was done using the Fuzzy AHP method, and the results showed that the employer's justification in terms of project time with a weight of (0.122) was in first place, the project manager's activity and the ability to build designs with a weight of (0.108) in second place, the quality of project planning with a weight of (0.108) in third place, Communication and cooperation between implementation factors were ranked fourth with a weight of (0.100), sound financial management with a weight of (0.099) in fifth place, supervision of project workshop activities with a weight of (0.095) in sixth place, selection and supervision of contractors with a weight of (0.095) in seventh place, justification of the employer in terms of project quality with a weight of (0.0818) in eighth place, and selection of the best contractor with a weight of (0.809).
		</p>
		</abstract>
    </article-meta>
  </front>
  <body></body>
  <back>
    <ack>
      <p>null</p>
    </ack>
  </back>
</article>